brochure 665 2/63

The Menck-Tubular-Frame piling rigs are supplied with steam, electric-or diesel-hydraulic drive.The steam boiler is normally adequate for a pile driving period of approximately 30 minutes. Besides single-acting menck pile hammers drop hammers can also be operated with a follower rope on the steam driven piling rigs.Moreover, the next bigger-or smaller pile hammer model-with exception of the drop hammer-can be used on the piling rigs. The weight of the pile hammer and pile, however, may not exceed the lifting capacity of the piling rig.

There were the following types: MR 8, Mr 12, Mr 18,MR 27, MR 40, MR 60  and MR 100

Typ

MR 18

MR 27

MR 40

MR 60

MR 100

overall height

22,64 m

25,93 m

29,85 m

34,50 m

44,00 m

effective height

17,50 m

20,50 m

24,00 m

28,00 m

35,00 m

min. working radius of leader

2,66 m

3,08 m

3,55 m

4,12 m

5,32 m

max. working radius of leader

3,56 m

4,13 m

4,80 m

5,62 m

7,12 m

admissible load: pile and hammer

6200 kg

9500 kg

14000 kg

22000 kg

35000 kg

leader lowering depth

5,70 m

6,10 m

6,60 m

7,25 m

9,00 m

frame height

14,00 m

16,40 m

19,40 m

22,65 m

28,00 m

rear end radius

4,02 m

4,13 m

5,00 m

6,10 m

7,50 m

track gauge

3,40 m

3,90 m

4,50 m

5,20 m

6,50 m

wheel base

3,47 m

3,98 m

4,59 m

5,30 m

6,60 m

leader width

0,40 m

0,46 m

0,545 m

0,625 m

0,75 m

min. heating surface of boiler

10,00 qm.

13,50 qm

17,50 qm

24,50 qm

32,00 qm

constr. weight incl. boiler

21000 kg

30000 kg

43500 kg

66500 kg

 

technical specification from the brochure: 508 11.53

Parts of a piling rig: